PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Pour concrete at Stair -2 slab Facing West  (800x600).jpg Pour concrete at Stair -4 slab Facing East (800x600).jpg Started installing steel angles around Derrick -7 (2nd Floor) Facing North-West (800x600).jpg Built rebar boxes at trench drains (Room 141) Facing West (800x600).jpg Built rebar boxes at trench drains (Room 142) Facing West  (800x600).jpg Welding moment connections at Derrick -7 (2nd Floor) Facing South (800x600).jpg
Previous pageNext page Built rebar boxes at trench drains (Room 142) Facing West  (800x600)
Built rebar boxes at trench drains (Room 142) Facing West (800x600)